Day 8 - Floor and Electrical Rough-In
Day 8 - still working on the floor, but our electrician also came over to start roughing in the walls.

Addition side - to the studs


The addition did not have any insulation underneath, while the original side had the insulation from underneath in the basement.

The subfloor is almost all in. You can also see that the subfloor is tongue-and-groove plywood, with the idea that it will create a more unified surface.
The electrical stuff is not real thrilling to look at, but it is progress with the walls off.

You can also see the addition side to the studs, after the insulation was removed.
Check out the full day's pictures:
http://s95.photobucket.com/albums/l144/ranchkitchen/Day 8 - Floor Framing and Elec Rough In/

Addition side - to the studs


The addition did not have any insulation underneath, while the original side had the insulation from underneath in the basement.

The subfloor is almost all in. You can also see that the subfloor is tongue-and-groove plywood, with the idea that it will create a more unified surface.
The electrical stuff is not real thrilling to look at, but it is progress with the walls off.

You can also see the addition side to the studs, after the insulation was removed.