Thursday, August 31, 2006

Day 7 - Floor Framing (Cont)

Day 7 was more of the same with the floor framing and leveling. It is taking longer than the contractor estimated but probably not more than we expected in the back of our heads.

We would rather he take longer and get the damn thing level.

The original side starts to get the new subfloor, while the new side get level.


Here is a closer look to how the addition was built up and why it was not level. The joists were placed on the raised edge without being notched. This made it slope toward the side door.


Closer look to the joists after being fixed


A lot of business that is "pushed" over to the addition side, including: electrical, gas line, HVAC.


Check out the Day 7 picutres here:
http://s95.photobucket.com/albums/l144/ranchkitchen/Day 7 - Floor Framing/