Day 5 & 6 - Floor Demo and Framing
Day 5 and 6 was the continued work on the floor.
By Day 5, the old flooring and subfloor was completely removed. And we also got rid of the dumpster in our driveway.
Day 6 started the floor framing, or making the joists level for the new floor. Some joists were shaped and others were replaced.
This is all very interesting, because you can see the pipes, HVAC, and electrical from above the basement. You can also see the orginal foundation wall and how they built the addition.
Old side to the left, new to the right.

You can see the foundation wall and the end of the crawl space.

You can see the water main and the gas line that was poked into the addition side.

Here you can see the old drain line and how it was disconnected from below.

General area and exposed basement.

No Dumpster!!!!!

You can browse the entire photo set here:
http://s95.photobucket.com/albums/l144/ranchkitchen/Day 6 - Floor Demo and Framing/
By Day 5, the old flooring and subfloor was completely removed. And we also got rid of the dumpster in our driveway.
Day 6 started the floor framing, or making the joists level for the new floor. Some joists were shaped and others were replaced.
This is all very interesting, because you can see the pipes, HVAC, and electrical from above the basement. You can also see the orginal foundation wall and how they built the addition.
Old side to the left, new to the right.

You can see the foundation wall and the end of the crawl space.

You can see the water main and the gas line that was poked into the addition side.

Here you can see the old drain line and how it was disconnected from below.

General area and exposed basement.

No Dumpster!!!!!

You can browse the entire photo set here:
http://s95.photobucket.com/albums/l144/ranchkitchen/Day 6 - Floor Demo and Framing/
0 Comments:
Post a Comment
<< Home