Wednesday, September 13, 2006

Day 21 - Drywall Prep and No Electrical Work

Today our electrician performed no work.

The electrician was to look at moving our cans, but he had some truck trouble - or something along those lines.

Our contractor did some final finishing prep touches for the drywall installation.

Tomorrow (Wed) the drywall will be hung and after that, the electrician will get back in there and move around our can layouts.

All Day 21 Pictures:
http://s95.photobucket.com/albums/l144/ranchkitchen/Day 21 - Drywall Prep/

0 Comments:

Post a Comment

<< Home