Contractor Scope - Final
Current estimated cost is $41,614. Updated summary spreadsheet is included in the online spreadshseet (see right side links).
We clarified language for details in the scope document with the contractor last evening.
Minor changes for the following
- $200 to relocate dining room HVAC vent to accomodate circuit panel move
- $75 to pickup and stock tile from HD Expo distribution center
- $125 labor to install new door from kitchen to 3rd bedroom
- $150 materials for new door purchase (preceding item)
We clarified language for details in the scope document with the contractor last evening.
Minor changes for the following
- $200 to relocate dining room HVAC vent to accomodate circuit panel move
- $75 to pickup and stock tile from HD Expo distribution center
- $125 labor to install new door from kitchen to 3rd bedroom
- $150 materials for new door purchase (preceding item)